35.2 MWp (DC) photovoltaic project in Quito, Ecuador. Presented for the formation of an international consortium (Investor + EPC + National Operator) under a BOT model with a 25-year concession agreement (with option to negotiate extended duration).
Nominal Capacity
35.2 MWp DC / 30 MW AC
Concession Horizon
25 Years (+ Extension)
SNT Hosting Capacity
210 MW Available (N-1)
Total CAPEX (Tier 1 Equipment, 5km Line, Engineering & Freight).
1.69 TWh
25-Year Cumulative Gen
$112.8M
Levelized Energy Value (25Y)
53,824
Tier 1 665W Solar Modules
210 MW
Available Grid Capacity
Consolidated study data based on the Technical-Economic Feasibility Study (IT01-PFA-HEC-R0) conducted by HELP ENERGY CONSULTORES S.A.
Located in Guamaní parish, Quito (Pichincha) at 3,638 m.a.s.l. The site covers 27.79 hectares with flat topography (average 1.4% slope), minimizing earthworks costs. High solar irradiance at high altitude combined with cool ambient temperatures optimizes module thermal efficiency.
| Min Elevation | Avg Elevation | Max Elevation | Avg Slope | Max Slope |
|---|---|---|---|---|
| 3,544 m | 3,613 m | 3,675 m | 1.4 % (Excellent) | 4.2 % |
Comprehensive financial metrics based on $22.4M CAPEX, $66.67/MWh LCOE baseline, and 25-year concession timeline in Ecuador.
Gross Annual Revenue (Y1)
$4.51M USD
67.68 GWh @ $66.67/MWh baseline
Estimated Payback
~5.8 Years
CAPEX amortization horizon
Estimated EBITDA Margin
~85 %
Low O&M structure & zero VAT
Projected 25Y IRR
~15.2 %
Unlevered equity return
The 25-year concession timeline provides predictable long-term cash flows backed by low OPEX requirements and strong regulatory protections under Ecuadorian energy laws.
Accurate yield tracking from incident solar radiation (GHI) to AC grid injection.
Base GHI. Spectral correction (-1.00%) & albedo gain (+1.34%).
Nominal output based on PERC bifacial efficiency (22.54%).
Temp loss (-1.66%), weak light (-1.85%) & mismatch (-2.00%).
Net annual energy injected to grid post central inverter conversion.
Designed to provide legal certainty and high return for the consortium over a 25-year extendable framework.
The Investor + EPC Consortium executes the turnkey installation ($22.4M CAPEX) under detailed engineering and supervision.
Continuous operation partnering with a qualified Ecuadorian National Operator for O&M, market dispatch with CENACE, and maintenance.
Upon reaching the 25-year milestone, preferential negotiation options for additional time extension or asset transfer are triggered.
Get in touch directly with the project presenter to access the technical Data Room and coordinate consortium structuring.
GES ECUADOR
We present this project as the promoter, facilitator, and creator of the consortium opportunity, bringing together international investment, EPC contractors, and a qualified National Operator in Ecuador.